Standort
Los Arcos, Navarre / Spain
Realization
Phase I: 09 / 2007 – 02 / 2008
Phase II: 04 / 2008 – 06 / 2008
Key data
PV power: 3,120 kWp
PV modules phase I: 9,464 pieces of Energetica E-134B (1.27 MWp)
Phase II PV modules: 8,050 Energetica E-2000 units (1.85 MWp)
Tracking system: 676 pieces Follow Sun 14
Inverter: Ingeteam Ingecon SUN
spec. Annual yield: 1,650 kWh / kWp
Annual yield: approx.5,200,000 kWh / year
CO2 reduction: approx.2,600 t / year